
Insulated panel · Mount Albert, Auckland
Industrial insulated panel quarantine facility shop drawings, Mount Albert, Auckland
Marsco Architecture prepared insulated panel shop drawings for Bondor on the Ministry for Primary Industries (MPI) Interim Post Entry Quarantine (IPEQ) facility at Mount Albert, Auckland. Bondor XFLAM panels formed internal walls, external walls and ceilings across biocontainment-rated laboratory and support spaces in a compact head house (approximately 11 m by 16 m, excluding greenhouses) plus twelve linked greenhouses. Marsco was brought in late when shop drawings had slipped through a coordination gap, with an initial ten-day turnaround target. Completed February 2024. Shop drawings only, not building design or consent.
Read the full project story





