A complete, coordinated set
Site plan, floor plans, elevations, sections and the construction details a council assessor needs to grant consent: prepared to hang together, not as loose sheets.
Building consent drawings · LBP sign-off · Manawatū
If you need building consent drawings in the Manawatū, you have a project ready to go and need documentation that will get through council without delays. We prepare complete, coordinated consent sets for Palmerston North City Council and Manawatū District Council, with LBP Design Class sign-off included.
What you get
The cost of a consent isn't the lodgement fee, it's the weeks lost when an incomplete application bounces back as a request for further information. We prepare the set to answer the assessor's questions before they're asked, so the consent keeps moving.
Site plan, floor plans, elevations, sections and the construction details a council assessor needs to grant consent: prepared to hang together, not as loose sheets.
Scott signs off the restricted building work and provides the Record of Building Work, so the person who drew your set is the licensed practitioner behind it.
Documented the way PNCC and Manawatū District Council assess applications, to keep the consent moving and minimise requests for further information.
A consent application needs a coordinated set: a site plan, floor plans, elevations and sections, plus the construction details that show how the building meets the Building Code, foundations, bracing, cladding and the weathertightness junctions that councils scrutinise most closely. Most projects also need written specifications, and depending on the work, producer statements or engineering from a chartered engineer.
The drawings have to agree with one another and with the spec, a set where the floor plan and the elevations disagree is a fast track to a request for further information. Coordinating all of that is the job.
The structural and weathertightness aspects of most homes are restricted building work, which must be designed or reviewed by a Licensed Building Practitioner. The designer provides a Memorandum, a Record of Building Work, with the consent application, naming who is responsible for the restricted work.
Scott holds LBP Design Class, so for the residential and light commercial projects we cover, the person who draws your consent set is also the licensed practitioner who signs it off. There is more on what that licence covers in the what is LBP Design Class explainer.
Councils have a statutory 20 working days to process a complete application, and both Palmerston North City Council and Manawatū District Council work to that. The catch is the word “complete”, the clock stops whenever a council issues a request for further information, so a thin or inconsistent application can stretch a 20-day process into months.
The most reliable way to hit the timeframe is a thorough set that pre-empts the assessor's questions. We dig into the detail on the how long building consent takes in Palmerston North FAQ, and the design process page shows how the consent stage fits into a project.
We can often take a concept or a partial set and develop it into a full, lodgeable consent application, after a quick, honest review of what's usable. If your drawings have already been turned down by a council or carry problems that need fixing, that's a different job, and one we do regularly through our building design remediation service.
We're based in Palmerston North and know the local consent landscape first-hand. If you're building in the city, the Palmerston North page covers the local council process and conditions in more detail.
Common questions
Tell us about your project and where it's at. There's no cost to start the conversation, and we'll tell you plainly what your consent application needs and how long it should take.